Digital Chum - Virtual fish guts and other nonsense

excavation

Construction Time Lapse Video

I had a time lapse camera set up across the street taking pictures every 5 seconds. The batteries lasted from April 12th through June 1st. I got the video (the camera creates an AVI) and edited out all the nights and weekends. It’s almost seven minutes long which is longer than I wanted, but speeding it up in my editor didn’t work too well, so I left it alone.

Stuck in the Middle

Front of the house as of June 27th, 2015. All the windows (except for one) are in. Shingles are on. House is wrapped (except the garage door area because of framing work they’ll need to do when the garage doors are installed).

We’re sort of squished in the middle.

Stuck in the Middle

Stuck in the Middle

Drilling wells

We’re having a geothermal HVAC system installed and they started drilling the wells a couple weeks ago. The original plan was to have four 250-foot holes for the larger geothermal unit and three 250-foot holes for the smaller unit (because of the length of the house, it’s more efficient and cost effective to have two units like that). However, around 80 feet down, the driller hit a big area of sand and the hole kept collapsing back on itself almost immediately, so the hole plan had to change. There will be twelve 80-foot holes for the larger unit and eight 90-foot holes for the smaller unit. Our whole back yard is currently dotted with holes spouting black tubing!

Once it’s all done, everything will be hidden four feet underground, so it’s no big deal. It will actually be a little easier on the geothermal pump because of the shallower wells. We just have to make sure that any future construction plans don’t dig down deeper than four feet!

Geothermal well drilling

No in-ground pool for us!

Stuff Everywhere!

Master bedroom framing

Master bedroom framing

It’s amazing the progress that’s been made since my last update (which was, admittedly, a long time ago). We’re still living in the center section (the original house, basically), but both additions are nearing the point where they’re going to be drywalled.

The roofs are done and shingled. The windows (except for one that’s on order) are all installed. The interior framing is (I think) all done except for, perhaps, a few minor things. Plumbing, electrical, and HVAC work are done on the garage wing and have been started on the master bedroom wing.

That’s expected to be completed by next Monday or Tuesday so the inspectors can check it out and the insulators can come do their bit. After that, it’s drywall time!

Framing in Megan's room

Framing in Megan’s room

HVAC duct work

HVAC duct work in the garage

Electrical panels

Electrical panels in the garage

 

 

 

 

I don’t have a current, full exterior view at the moment and it’s raining right now, so I can’t go take one, but here’s a shot around the back of the master bedroom wing. They just finished roofing the porch out of the master bedroom so I took a picture of that and of the view that we’ll have from the bedroom out onto the porch.

Master bedroom porch and view

Master bedroom porch and view

Roof Trusses!

Most of the roof trusses got installed yesterday… all the really big ones, anyway. It’s really taking shape now! …though it looks like our little house is trapped in the middle.

Roof Trusses!

Most of the roof trusses got installed yesterday!

Lots of Framing Progress

Placing the steel beam for the garage

Placing the steel beam for the garage

It’s been about two weeks since my last update and a lot has gone on since then. Wayne and his crew have been working crazy fast to get things done and the results are amazing to see every day when I get home from work.

The steel support beam was added to the garage. They started out with the beam sitting on pillars of stacked concrete blocks. That let them get the beam to the right height and steady enough so they could start adding the floor joists on top of it.

Installing floor joists

Installing floor joists

All three garage doors!

All three garage doors!

Permanent steel posts.

Permanent steel posts.

Midway through installing the joists, they finished framing the front of the garage, adding the third door (on the left side). They notched part of the existing house roof to accommodate the wall. Eventually, that roof will come off completely, but they didn’t want to do that quite yet in case of foul weather.

A bit after getting all the joists installed and putting the sub-floor down, they added the steel posts and removed the temporary concrete pillars. Now the garage is like an actual room, which was a nice transformation.

I took Megan up on top of it to get a feel for her soon-to-be living space. I think she’ll have plenty of room. Right now, it’s just a nice place to get some sun and enjoy the view.

Garage with floor installed!

Garage with floor installed!

 

Master bedroom wing... Stage 1

Master bedroom wing… Stage 1

Meanwhile, at the other end of the house, they’ve been working on the master bedroom wing. The concrete floor was poured and they had the basement level framed out in less than a week. The transformation was pretty amazing, especially from the inside where it suddenly got real seeing how the whole floor was going to be laid out. It’s much more exciting seeing it in real life than it is visualizing it from a paper drawing.

Lori and Rose talking construction

Lori and Rose talking construction

Lori and Rose in the basement hallway

Lori and Rose in the basement hallway



They ended last week having all but one wall of the first floor framed out, which includes the master bedroom, the closets, and the master bathroom. As with the basement level, it was great getting to physically walk through the “rooms” rather than just visualizing them from the drawings. Lori and I walked through it a number of times, probably with facial expressions similar to all the golden-ticket-winning kids from Willy Wonka when they first saw the inside of the factory.

Master bedroom wing - Stage 2!

Master bedroom wing – Stage 2!

Back of master bedroom wing

Back of master bedroom wing

Looking through the master bedroom

Looking through the master bedroom

Looking from the master bathroom through the closet hallway into the master bedroom and out to the porch.

Looking from the master bathroom through the closet hallway into the master bedroom and out to the porch.

I’ve been framed!

Building the back wall The framing of the garage started on Thursday and continued through Friday. After a bunch of prep work and measuring, they framed up the back wall of the garage which has a door and three windows. They built the main part of the wall flat on the floor and then used their forklift to hoist it into place, nailing it to the sill plate.


Hoisting the wall Hoisting the wall

The weather really treated us well and the rain stopped before 6:00 am on Friday morning. The day turned beautiful and the framing started up again around 7:30. They framed up the end exterior wall and then continued around the corner to the entry door and two of the three garage doors. They couldn’t do the last door yet (the one closest to the house) because they’ll have to remove the roof of the existing garage for that to happen and they weren’t ready to do that yet.

Going around the corner Two of three doors completed!

The main support beam for the garageSome time around noon, the beam was delivered that will span the garage. Wayne (Co-Del Construction) found a used beam from a building that was getting ripped apart in Red Lion, and he saved us a bunch of money by doing that. They’re planning on putting the beam up Monday or Tuesday, I think.


After lunch, they framed up the internal walls and then started putting the sheathing on the exterior walls and it really started to look like an actual building. By the time they left for the day, they had all the exterior walls covered and had framed around as far as they could go at this stage.

Exterior sheathing Look! Real walls! It almost looks like an actual garage!

Big garage doorsOur garage doors are oversized and standing next to one made that quite evident. I should have no trouble parking my M1 Abrams tank in the garage, which is good because I hate leaving it out in the rain.


So… here’s the final shot from up the bank at the end of the garage. Things are really shaping up!Shaping up!

Foundation Stuff

No more garage door!Last week was a busy week. I didn’t do any updates because a lot of the work was not particularly interesting from a picture standpoint. Now that it’s all done and some additional foundation work was done, there are plenty of pictures that show the progress much better.

Inside the garageThey finished all the block work for both the garage wing and the master bedroom wing. In the process, we had to lose one of our garage doors because they had to cut a huge chunk out of the concrete floor to run some pipes and tie in that part of the existing floor to the new floor of the new garage.  The second picture is on the other side of the no-longer-existing garage door.

Losing the garage piece by piece

As you can see, they also removed the bottom half of the wall at the end of the existing garage. That was a really bizarre sight to see when I got home that day. They didn’t remove the entire wall for a couple reasons, one of them being weather. The other reason is that the electrical panel is on that wall and they’re not ready to have that moved yet.

Master bedroom wing foundation wallThe master bedroom wing block walls are all done as well. In this picture, they’re not quite done, but they were the next day. They ran short of the right kind of block for the rest of the top row (on the right side of the picture). They only needed about twelve more blocks. Doh! But now that is all done and it’s about ready to have the floor poured as soon as some electrical fixtures are set up for an in-floor outlet in the library.

Future computer room door Back inside the garage they also removed all the drywall and the plywood from the attic space. They knocked out the back wall and framed it out for the pocket door that will lead from a hallway into the computer room. That was another disconcerting scene to see when I got home, though I didn’t notice it when I walked past the first time. The second time, I did a jump-back, wide-eyed double-take when I noticed it!

They poured the entire new garage floor on Monday, April 13th starting very early in the morning. The floor took just over two truck loads of concrete. For the third load, they got enough to pour the computer room floor as well, so now two out of three foundation floors are all poured and ready to go!

First truck load of the day!

First truck load of the day!

Spreading the concrete around

Spreading the concrete around

Finishing it up

Finishing it up

Computer room foundation

Computer room foundation


Now the house won't be stolen!

Lori engraved our names in one corner of the garage floor, including a 2014 penny for the year we bought the property and a paw print for the cats. I told Lori I thought it was a good idea to have our names engraved on it so nobody could steal the house.

Just for good measure, Yoda inspected the new garage floor and seemed to approve. Time to frame it up!

Yoda approves.

More block walls

Back corner of house

Back corner of house – garage and computer room

The block walls around the garage and the computer room are all finished. The masons were working on the master bedroom wing walls today and are almost finished there as well. They won’t be around on Thursday and it’s supposed to rain on Friday, so we may have to wait until next week to see all the walls completed.

Other things will probably happen during that time, but we don’t know exactly what yet.

Computer room

Computer room

Computer room

Computer room

Master bedroom wing

Master bedroom wing

Master bedroom wing

Master bedroom wing

Master bedroom wing

Master bedroom wing

Master bedroom wing - Fireplace/Porch bump out

Master bedroom wing – Fireplace/Porch bump out

Soda storage!

Soda storage!

 

Building up!

Garage wing block walls!

Imagination!Today is the first day we were building up rather than down. The block arrived this morning and the masons all but finished laying the block for the garage wing. It was exciting seeing the beginning stages of the walls, including the locations of the doors.  Up until this point, all this stuff could only be seen using the power of… imagination.

Door for the garage entryway Never having been through this process, I was amazed at how many different sizes and shapes of block they use. There were special corner blocks, different size blocks for different height walls, different widths and thicknesses.

Angled blocksThere were even angled blocks that they’ll use for the master bedroom bump-out.

Tomorrow, they’ll work on the master bedroom wing and the computer room extension.

 

Block waiting for the master bedroom wing